|
Abstract: . . . 3) FACILITY LAYOUT Powerhouse, Warehouse, and Switchyard Area Page 118 Spill Prevention, Control and Countermeasure Plan, Revision 1 Page 19 of 25 ATTACHMENT 6.4 (Page 2 of 3) FACILITY LAYOUT Control Building Raw Water Tank Area Page 119 Spill Prevention, Control and Countermeasure Plan, Revision 1 Page 20 of 25 ATTACHMENT 6.4 (Page 3 of 3) FACILITY LAYOUT Intake Area at Packwood Lake Page 120 Spill Prevention, Control and Countermeasure . . . . . . Waste, Physical/Chemical Methods (SW-846), United States Environmental Protection Agency, 1986 CERTIFICATION AUTHORITY POINTS OF CONTACT State of Washington (206) 895-4649 Department of Ecology FAX (206) 895-4648 Quality Assurance Section P.O. Box 488 Manchester, WA 98353 Page 99 APPENDIX D SPILL PREVENTION, CONTROL, AND COUNTERMEASURE PLAN Page 100 Spill Prevention, Control and Countermeasure Plan, Revision 1 Page 1 of 25 TABLE . . . . . . year, as for analytical balances. These may be at a single point or over a wide range of values. Frequency, range, number of points and acceptance criteria meet or exceed, in order of precedence, the requirements of: study protocol or project quality plan; client or contract; analytical method; or SOP. DATA MANAGEMENT Data handling methods used by laboratory personnel, as well as the measures taken to ensure that sample data are . . . . . . in Packwood files Checklist Completed By: ___________________________ ________________________ Name (Signature) Title Date Completed: __________________________ Page 124 Spill Prevention, Control and Countermeasure Plan, Revision 1 Page 25 of 25 ATTACHMENT 6.9 (1 of 1) PACKWOOD LAKE HYDROELECTRIC PROJECT OIL, FUEL, AND HAZARDOUS MATERIAL SPILLS Date Approximate Location Material Spilled Approximate Quantity Comments 11/19/01 Switchyard . . . . . . PROJECT OIL, FUEL, AND HAZARDOUS MATERIAL SPILLS Date Approximate Location Material Spilled Approximate Quantity Comments 11/19/01 Switchyard – Main Transformer Failure Oil 20 gal Oil bleed out the top of the transformer. Because it was a rainy day, the spill spread through the switchyard. Oil absorbent and booms were used to clean up the oil. There were no spills in 2002 and 2003. . . . . . . personnel files. Personnel evaluations, as well as blind sample and audit results, can prompt scheduling of additional laboratory training sessions. AUDITS Audits of Environmental Services programs are performed by the Energy Northwest Quality Program / Quality Control group. The audit frequency and selection of programs is determined by the Quality Program / Quality Control group. Clients and customers may also audit laboratory operations, . . . . . . hydroelectric energy Water Quality Study Plan for Energy Northwest's Packwood Lake Hydroelectric Project FERC No. 2244 Lewis County, Washington Page 1 Revised Water Quality Study Plan for Energy Northwest's Packwood Lake Hydroelectric Project FERC No. 2244 Lewis County, Washington Submitted to P.O. Box 968 Richland, Washington 99352-0968 Submitted by 1155 North State Street, Suite 700 Bellingham, Washington . . . --3000,7,214,3453,258278
|