Abstract: . . . 20050909-3042 Issued by FERC OSEC 09/09/2005 in Docket#: P-2210-108 FEDERAL ENERGY REGULATORY COMMISSION Washington, DC 20426 September 9, 2005 OFFICE OF ENERGY PROJECTS Project No. 2210-108 – Virginia Smith Mountain Hydroelectric Project Appalachian Power Company Frank Simms Hydro . . . . . . Issued by FERC OSEC 09/09/2005 in Docket#: P-2210-108 4 If you have any questions, please contact Allan Creamer at (202) 502-8365, or via e-mail at allan.creamer@ferc.gov. Sincerely, J. Mark Robison Director Office of Energy Projects Enclosure A: Appendix A, Response to Comments on Revised Study Plan Enclosure B: Appendix B, List of Studies cc: Mailing List Public Files 20050909-3042 Issued by FERC OSEC 09/09/2005 in Docket#: P-2210-108 . . . . . . 20050909-3042 Issued by FERC OSEC 09/09/2005 in Docket#: P-2210-108 FEDERAL ENERGY REGULATORY COMMISSION Washington, DC 20426 September 9, 2005 OFFICE OF ENERGY PROJECTS Project No. 2210-108 – Virginia Smith Mountain Hydroelectric Project Appalachian Power Company Frank Simms Hydro Support Manager . . . . . . the scope of this relicensing. Staff do not recommend incorporating analysis of flowage easement taxes into the socioeconomic study. Any agreements between/among parties regarding easement tax rates are outside the Commission’s jurisdiction. Tax information that is applicable to the relicensing process should be accurately reflected by an analysis of fiscal effects, which is a component of the socioeconomic study plan. The TCRC’s . . . . . . duplication of effort by survey personnel, as all necessary information would be collected through a single vehicle. xviii 20050909-3042 Issued by FERC OSEC 09/09/2005 in Docket#: P-2210-108 Smith Mountain Project Project No. 2210-108 APPENDIX B Appalachian Power’s List of Studies Appalachian Power Company’s Revised Study Plans • Archaeological and Historic Resources • Navigational Aids • Erosion • Sedimentation • Recreation . . . . . . duplication of effort by survey personnel, as all necessary information would be collected through a single vehicle. xviii 20050909-3042 Issued by FERC OSEC 09/09/2005 in Docket#: P-2210-108 Smith Mountain Project Project No. 2210-108 APPENDIX B Appalachian Power’s List of Studies Appalachian Power Company’s Revised Study Plans • Archaeological and Historic Resources • Navigational Aids • Erosion • Sedimentation • Recreation Assessment . . . . . . of effort by survey personnel, as all necessary information would be collected through a single vehicle. xviii 20050909-3042 Issued by FERC OSEC 09/09/2005 in Docket#: P-2210-108 Smith Mountain Project Project No. 2210-108 APPENDIX B Appalachian Power’s List of Studies Appalachian Power Company’s Revised Study Plans • Archaeological and Historic Resources • Navigational Aids • Erosion • Sedimentation • Recreation Assessment • . . . --3000,7,214,3238,59529
|