Abstract: . . . Particular attention shall be given to the prevention of corrosion at the connections between dissimilar metals such as aluminum and steel. All fasteners shall be stainless steel. Because the photovoltaic system will most likely outlast the roofing materials, the structural installation design should provide for easy and cost-effective repair/replacement of the roof under the photovoltaic system. Page 55 Exhibit I Page 3 DB-101 October 31, 2003 Roof penetrations (if any) must be waterproofed, and the respondent must provide at least a 10-year warranty against water leakage. Collaboration with the roofing professional responsible for the roof’s warranty at the facility may be necessary. As part of the project the Contractor shall upon initiation . . . . . . marked “Solar Photovoltaic Renewable Energy Plant at the Southeast Water Pollution Control Plant” and received at the following location no later than 3:00 p.m., on December 11, 2003. Late proposals will not be accepted—postmarks will not qualify as delivery. Proposals should be mailed or delivered to: San Francisco Public Utilities Commission Contract Administration 1155 Market Street, 7 th Floor San Francisco, CA 94103 Attn: Ms. Linda Denari Proposals submitted by fax or electronically will not be accepted. After reviewing this RFP and Exhibits, firms interested in providing the services described herein must submit the following information, in the order specified below. Proposals must include the following items in the order presented. Page . . . . . . proposers to include local labor trained and certified in Solar Photovoltaic System installation in this project, and is allocating 2 percent of total evaluation points for compliance to this request. Consultants who wish to submit a proposal must contact Diana Rathbone of the Human Rights Commission at (415) 554-3100 prior to submitting proposals to discuss the Sub-consultant Development Plan and MBE/WBE/Affirmative Action requirements. In accordance with San Francisco Administrative Code Chapter 6, no proposal will be accepted and no agreement in excess of $50,000 will be awarded by the City and County of San Francisco until such time Page 4 as: (a) the department head recommends the agreement for award; and (b) the Commission then adopts a resolution . . . . . . offered, Page 58 Exhibit J Page 2 DB-101 October 31, 2003 measured at the input to the inverter(s) including all materials furnished and all work performed by the Contractor under the Contract against defective design, materials, workings and latent defects for a period of twenty-five (25) year after successful acceptance tests. 2. The terms and conditions related to warranties and guarantees shall be in accordance to those per attached Sample Design Build Agreement found in Exhibit A. . . . --3000,4,375,3049,88802
|