Abstract: . . . (PCS), and inverter is a device that changes dc input to ac output. Inverters may also function as battery chargers that use alternating current from another course and convert it into direct current for charging batteries. Inverters for PV systems in sizes from 100 watts to custom designs of up to 1 MW or more DC operating voltages of 12 volts up to 600 volts, with AC outputs from 120 V single phase to 480 V three phase. Trace SW5548 Inverter 19 PV System: Back-up Diesel Generator 17 kW Diesel Gen-Set 20 PV Systems: Meters – “User Friendly” Trace TM500 Meter 21 Solar Photovoltaic System: Applicable Codes by Component UL1741 IEEE929 PV Array UL1703 NEC690 ASCE 7-98 Inverter Charger Controller load center NEC690 NEC705 IEEE929 NEC480 IEEE937 battery 22 Electrical Code Compliance and Equipment Listing NEC requires approvals or listing for components and electrical hardware. Recognized laboratories include: Underwriters Laboratory (UL) http://ulstandardsinfonet.ul.com ETL Semko http://www.etlsemko.com Canadian Standards Association (CSA) http://www.csa.ca FM Global http://www.fmglobal.com Article 110-3(B): Examination, Identification, . . . . . . installed in accordance with any instructions included in the listing or labeling. 23 Utility Interconnection: Typical Issues Listed equipment Inspected and approved installations Liability insurance Disconnect provisions Metering options Billing practices Testing and monitoring Size restrictions Fees for interconnection application, special billing or metering 24 Reference Resources Complete on-line resource for presentations, documents, reference and resource links: http://www.fsec.ucf.edu/PVT/Education/training/inspgcps/handbook/index.htm Code and Standards for Photovoltaic Systems and Equipment: http://www.fsec.ucf.edu/PVT/RESOURCES/pvcodes/index.htp Institute of Electrical and Electronics Engineers (IEEE) standards: http://standards.ieee.org/ Underwriters Laboratory standards: http://ulstandardsinfonet.ul.com/ National Electrical Code, NFPA 70, National Fire Protection Association: http://www.nfpa.org 25 References (cont.) Connecting to the Grid – Interstate Renewable Energy Association website: http://www.irecusa.org/connect/index.html Florida Building Code http://www.floridabuilding.org/ ASCE 7-98 Minimum Design Loads . . . --2265,2,566,2442,11325
|