|
Abstract: . . . 150 - 500 kW Above 500 kW - 5 MW Above 5 MW - 20 MW 20 To 20 MW §8 Section 1 Clause 2 3.90/kWh To 20 MW 20 For use of Category A III and A IV old wood, for plants brought into operation after July 1 st 2006 To 20 MW §8 Section 2 Clause 17.50/kWh 15.90/kWh 12.90/kWh To 150 kW Above 150 kW - 500 kW Above 500 kW - 5 MW 20 Section 2 applies only for specific fuel materials (regenerative raw materials). To 20 MW §8 Section 2 Clause 17.50/kWh 15.90/kWh 11.40/kWh To 150 kW Above 150 kW - 500 kW Above 500 kW - 5 MW 20 Section 2 Cause 2 applies to burning wood, as per Clause 1. 1 For biomass , additional combinations not represented here are possible under §8 Sections 2 - 4 Page 8 REACT - Renewable Energy Action - (Altener 2002-157) Case study #7 - Renewable Energy Law 8 To 20 MW §8 Section 3 13.50/kWh 11.90/kWh 10.90/kWh 10.40/kWh To 150 kW Above 150 kW - 500 kW Above 500 kW - 5 MW Above 5 MW - 20 MW 20 Section 3 applies for power generated in so-called de- coupled operation in cogeneration facilities To 20 MW §8 Section 4 13.50/kWh 11.90/kWh 10.90/kWh To 150 kW Above 150 kW - 500 kW Above 500 kW - 5 MW 20 Section 4 applies to all power from cogeneration plants, if certain innovative technologies are used. Geothermal Unlimited §9 Section 1 15.00/kWh 14.00/kWh 8.95/kWh 7.16/kWh To 5 MW Above 5 MW - 10 MW Above 10 MW - 20 MW Above 20 MW 20 Wind energy on land §10 Section 1 8.7/kWh (initial comp.) 5.5/kWh (final comp.) 20 The increased compensation clause will be granted for between 5 to . . . . . . kW - 500 kW Above 500 kW - 5 MW 20 Section 4 applies to all power from cogeneration plants, if certain innovative technologies are used. Geothermal Unlimited §9 Section 1 15.00/kWh 14.00/kWh 8.95/kWh 7.16/kWh To 5 MW Above 5 MW - 10 MW Above 10 MW - 20 MW Above 20 MW 20 Wind energy on land §10 Section 1 8.7/kWh (initial comp.) 5.5/kWh (final comp.) 20 The increased compensation clause will be granted for between 5 to 20 years, depending on the reference yield of the facility. Wind energy offshore §10 Section 3 9.10/kWh (initial comp) 6.19/kWh (final comp.) 20 The increased initial compensation rate is paid if the facility is brought into operation before 2011; it is granted for between 12 and 20 years, depending on location. Solar radiant energy On or at buildings or noise barriers §11 Section 2 57.4/kWh 54.6/kWh 54.0/kWh To 30 kW Above 30 kW - 100 kW Above 100 kW 20 Façade- integrated plants §11 Section 2 Clause 2 62.4/kWh 59.6/kWh 59.0/kWh To 30 kW Above 30 kW - 100 kW Above 100 kW 20 Other plants §11 Section 1 45.7/kWh 20 Certain site criteria must be satisfied . . . --3000,2,750,2740,19770
|